Selection of ultra-high speed high-quality motor and bearing supporting, can quickly crush a variety of soft and hard herbs, such as: Ganoderma lucidum, Panax notoginseng, etc.; It is suitable for Chinese medicine pharmacy, pharmacy, Chinese medicine processing plant, etc. The machine has the characteristics of small size, high efficiency, simple operation, delicate and beautiful, power saving, safety, etc. It is the most ideal crushing equipment for making capsule pills.
Usage method
Please turn off the power switch before using the machine.
1. Open the top cover (close clockwise, open counterclockwise).
2. Put the dried medicine into the crushing box.
3. Close the top cover tightly.
4, plug in the power, turn on the timer switch.
5, when the rolling sound is more uniform, indicating that the drug has been crushed into powder, you can shut down.
6. Open the lid and pour out the powder.
High speed crushing precautions
1. For the personal safety of the user, the power supply must be grounded.
2, the crushed material must be dry, not suitable for processing wet and greasy Chinese medicine.
3, the crushed drug should not exceed half of the capacity of the crushing tank.
4, general Chinese medicine crushing only half a minute, hard medicine crushing one minute.
5, the machine can not be used continuously for a long time, each boot time shall not exceed 5 minutes. If the number of processing is large, it should be used at intervals to prevent the bearing from overheating and damaging the motor.
6, when the cover is open, do not start the switch.
7, after long-term use, carbon brushes and blades such as serious wear, need to be replaced.
8, often check the blade screws, must be tightened.
The use of high speed crusher
1, crusher and power unit should be installed firmly. If the crusher is fixed for a long time, it should be fixed on the cement base; If the crusher is a mobile operation, the unit should be installed on the frame made of Angle iron, and ensure that the power engine (diesel engine or electric motor) and the pulley groove of the crusher are in the same plane of rotation. 2, after the installation of the crusher to check the fastening of the fasteners of each part, if loose to tighten. At the same time, check whether the tightness of the belt is appropriate.

3, before the shredder starts, first turn the rotor by hand, check whether the claw, hammer and rotor operation is flexible and reliable, there is no collision in the shell, whether the rotation direction of the rotor is consistent with the direction of the machine arrow, and whether the lubrication of the power machine and the shredder is good.
4, do not casually replace the pulley, in case the speed is too high to make the crushing chamber explode, or the speed is too low to affect the working efficiency of the crusher.
5, the pulverizer should be idled for 2 to 3 minutes after starting, and then feed after no abnormal phenomenon.
6, the work should always pay attention to the operation of the crusher, the feed should be uniform, to prevent blocking the stuffy car, do not overload for a long time. If it is found that there are vibration, noise, bearing and body temperature is too high, spraying material, etc., it should be stopped immediately for inspection, and the fault can be removed before continuing to work.
High speed mill maintenance
1, the machine is placed in a more stable place (can adjust the level of the adjusting foot), the surrounding environment should be clean, dry and ventilated.
2. The direction of motor rotation must be in the direction of the arrow marked on the cover.
3, the machine must first check the host cavity for debris, the material must be checked before crushing, the material is not allowed to be mixed with any impurities.
4. Regularly check whether the fixing nut of the movable gear plate is loose and all the fixed parts are not loose. In particular, the screws in the fixed gear tray should be checked.
5. Lubrication: where there is an oil cup, inject appropriate lubricating oil before starting, and increase the number of refueling times appropriately for continuous work. After the actual working time reaches 300 hours, the main shaft bearing cavity must be cleaned and replaced with new lubricating oil.
6. Pay attention to the use of process screw holes when replacing wearing parts and rolling bearings, and the operation is carried out by repairmen who are familiar with the machine. If the user's operation is difficult, it should be timely with the factory, do not disassemble at will.
To learn more about our Fangyuan products, please click this link :https://www.fine-mill.com.