First, prepare before starting
1. Check the integrity and fastening of the parts, especially the high-speed parts such as the hammer, and the fixing must be firm.
2, check whether the crusher is reliable on the machine base.
3. Check the lubrication status of bearings.
4. Open the door cover of the crushing chamber and check whether there is debris in the crushing chamber.
5, check the tightening of the guide plate, remove the debris absorbed by the magnet.
Second, boot

1, the above inspection is completed, start the motor no-load operation, such as the technical condition of each part is normal, until the speed is normal before the load can be run.
2, in operation, there should be no card magnetic and friction sound.
3, the screen should be firmly installed, sealed, no leakage, the screen frame should be fixed.
4. If abnormal noise, discharge blockage, bearing or motor overheating are found during the working process, feeding should be stopped, stopped for inspection and troubleshooting.
5, at the end of the work, the residual materials of all parts of the machine should be cleaned, and the machine must be cleaned for a long time and covered with a cloth.