1、The repair and replacement of the screen mesh are required. The screen mesh is made of thin steel plate or iron sheet punched holes. When the screen mesh is worn or punctured by foreign objects, if the damage area is not large, it can be repaired by riveting or soldering. If there is a large area of damage, a new screen should be replaced. When installing the screen mesh, the burred side of the screen mesh should be facing inward, the smooth side should be facing outward, and the screen mesh and screen frame should be tightly connected. When installing the ring screen mesh, The inner seam of the overlap should be in the direction of rotation to prevent the material from getting stuck at the overlap.
2、Lubrication and replacement of bearings are required. The crusher should clean the bearings after every 300 hours of operation. If the bearings are lubricated with engine oil, it is recommended to fill the gap of the bearing seat with 1/3 of the new engine oil, with a maximum of 1/2. Before operation, only tighten the cover type oil cup cover of the regular micro crusher a little. When the crusher bearings are severely worn or damaged, they should be replaced in a timely manner, and attention should be paid to strengthening lubrication. When using tapered roller bearings, Attention should be paid to checking the axial spacing of the bearings to maintain it at 0.2-0.4 millimeters. If there is any discomfort, it can be adjusted by adding or removing paper pads at the bearing cover.
3、The replacement of tooth claws and hammer pieces. In the crushing components, the grinding tooth claws and hammer pieces are vulnerable parts in the feed crusher, and are also the main components that affect the crushing quality and productivity. After the grinding tooth claws and hammer pieces are worn, they should be replaced in a timely manner. When replacing the tooth claws in a tooth claw crusher, the circular disc should be pulled out first. Before pulling out, the circular nut lock on the back of the disc should be opened, the circular nut should be unscrewed with a hook wrench, and the disc should be pulled out with a special puller, To ensure the balanced operation of the rotor, attention should be paid to replacing the complete set of teeth when replacing the universal crusher. After replacement, a static balance test should be conducted to ensure the stable operation of the crusher.

 

1

 

Send Inquiry

whatsapp

Phone

VK

Inquiry